BP121532 - 1065 Southwood Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP121532 - 1065 Southwood Drive
Neighbourhood: Harewood    
Street Address: 1065 Southwood Drive
Type of Application: Single / Two Family Alteration
File Number: BP121532
Date Application Submitted: December 21, 2015
Application Description: Re-construction of house after being ravaged by fire. Construction will entail re-building exact house over existing foundation. House to be two storey with built in garage and suite on the main level.
REVISION - Feb 29, 16 - Move lower/upper level bands, insert two additional panels. Panels now to be located on lower level next to washer/dryer and bedroom as wall connects to back of garage wall. On upper floor wood based panels to be adjacent to bedroom 1 ensuite, and behind bedroom 1 door on wall between room and bath.
Revision - April 06, 2016. Relocating Laundry on lower floor to closet facing entry foyer. Den becoming Bedroom with closet.
REVISION May 25, 2016; Revised en-suite Layout & added shower
Revised closet, Relocated bathroom, modified closet. See New Sheet SK1
REVISION May.31 2016- Ammend brace wall drawing to match floor plan on pag 1
REVISION JULY 4 2016- Add 24"x42" window in upper stairwell.
REVISION JULY 14, 2016: Upper floor layout changes.
Application Status: COMPLETED
Permit Value: $268,276.75
Builder: WINMAR NANAIMO
Issued Date: February 19, 2016
File Close Date: May 09, 2017
Expiry Date: February 19, 2018

Associated Properties

Address Zone More
1065 SOUTHWOOD DRIVE R1 Property Report

Process Steps

Task Status
WATER CONNECTION

Pipe and Connection must be visable for inspection

SCHEDULED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

FAILED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

FAILED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PARTIAL
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PARTIAL
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2017-05-09

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy