BP121432 - 6631 Island Hwy - Mall Corridor Renovation
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121432 - 6631 Island Hwy - Mall Corridor Renovation | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6631 Island Hwy - Mall Corridor Renovation |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP121432 |
Date Application Submitted: | November 12, 2015 |
Application Description: |
Interior renovation to Woodgrove Mall, work includes new wall, ceiling and floor finishes, new lighting, new entry doors, removing water clock and bulkheads throughout, 2 sinks added to food court area. No changes to corridor width or distance to exits. April 18, 2016 - Revision to add 2 more sinks to food court area. Nov 15, 2016 - Revision to replace Electrical Engineer Woodgrove Mall - Existing, Group E building, BCBC 3.2.2.57, sprinklered, non-combustible construction, fire alarm. |
Application Status: | COMPLETED |
Permit Value: | $11,845,000.00 |
Builder: | LEDCOR GROUP OF COMPANIES |
Issued Date: | December 29, 2015 |
File Close Date: | December 14, 2016 |
Expiry Date: | December 29, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
6631 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-12-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.