BP121364 - 40 Maki Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121364 - 40 Maki Road | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 40 Maki Road |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP121364 |
Date Application Submitted: | October 16, 2015 |
Application Description: |
Supreme Self Storage - All buildings except Building A are considered one building under Alternative Solutions by GBA. BCBC 2012 3.2.2.75, F-2 occupancy, 1 storey, sprinklered with fire alarm, combustible or non-combustible construction. to apply to this cluster of buildings. Bld D --- 1 storey 185.8 m2, Bld I --- 1 storey 371.6 m2, Bld R3 - 1 storey 111.48 m2, Alternative solution for egress /exit from individual storage units (emergency call alarm switches) and for the "Building Cluster" REVISON AUG 23, 2016 - Added foundation pile details for building D. |
Application Status: | COMPLETED |
Permit Value: | $450,000.00 |
Issued Date: | April 21, 2016 |
File Close Date: | April 28, 2017 |
Expiry Date: | April 21, 2018 |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
OCCUPANCY-OLD | CANCELLED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2017-04-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.