BP121348 - 4371 Boban Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121348 - 4371 Boban Drive | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 4371 Boban Drive |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP121348 |
Date Application Submitted: | October 09, 2015 |
Application Description: |
(Convoy Supply) Existing building classifications: 2012 BCBC 3.2.2.74, 712m2 (259m2 of covered open storage) Group F2, facing 1 street, 2 storey, combustible construction, non-sprinklered. 45 min FRR of floor assemblies required. Scope of work for permit: BLDG #1 - Construction of 178m2 open storage addition to rear of main building. Enclose 259m2 of existing open covered storage area on west elevation of main building. Install 31.77m2 of new covered timber frame front canopy entrance. Add washroom to 2nd floor. 2 hr FRR required around new hazmat storage room. 2 hr FRR required for west elevation wall, non combustible cladding. BLDG #2 - Enclose 343.60m2 of existing open covered storage accessory building. 2 hr FRR required for north elevation wall, non combustible cladding 1 hr FRR required for west elevation wall. REVISION: May 22, 2019 - Remove walls for Hazmat Room. |
Application Status: | HOLDBACK |
Permit Value: | $249,187.00 |
Builder: | JDG CONSTRUCTION MANAGMENT |
Issued Date: | December 11, 2015 |
File Close Date: | May 27, 2019 |
Expiry Date: | December 11, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
4371 BOBAN DRIVE | I2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-05-27 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.