BP121211 - 390 Stewart Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121211 - 390 Stewart Avenue | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 390 Stewart Avenue |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP121211 |
Date Application Submitted: | August 24, 2015 |
Application Description: |
Construction of a three storey single family dwelling beside a three storey secondary suite. Garage in lower level, slab on grade. REVISION March 23, 2015 - Conditions updated to reflect height/building location survey dated March 15, 2016. Spatial calculations not affected. REVISION: JULY 26/16 - Change interior stair layout and convert unfinished storage area to finished area, no plumbing fixture or interior walls. LB |
Application Status: | COMPLETED |
Permit Value: | $461,538.53 |
Building Area: |
350.71 M2 3,775.01 ft2 |
Builder: | 0873123 BC LTD |
Issued Date: | October 22, 2015 |
File Close Date: | August 02, 2016 |
Expiry Date: | October 22, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
390 STEWART AVENUE | R8 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2016-08-02 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.