BP121054 - 5192 Coach House Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121054 - 5192 Coach House Drive | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5192 Coach House Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP121054 |
Date Application Submitted: | July 10, 2015 |
Application Description: |
Construction of a 12'x39' deck on strip footings. Revision: Aug 28, 2015 -- Deck size reduced by 16" REVISION Oct 14, 2015 - Interior renovation to ensuite added to scope of work as detailed on drawings. REVISION June 15, 2016 - Revised bathrooms from previous revision. Remove bump-out and reconfigure both bathrooms. |
Application Status: | COMPLETED |
Permit Value: | $21,432.26 |
Building Area: |
45.70 M2 491.91 ft2 |
Builder: | BOEHM CONSTRUCTION LTD |
Issued Date: | August 18, 2015 |
File Close Date: | October 11, 2017 |
Expiry Date: | August 18, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
5192 COACH HOUSE DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-10-11 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.