BP120906 - 6330 McRobb Avenue(Main Permit)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120906 - 6330 McRobb Avenue(Main Permit) | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6330 McRobb Avenue(Main Permit) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP120906 |
Date Application Submitted: | June 01, 2015 |
Application Description: |
Rental Residential Apartment: 50 Residential units - 4 storeys , Group C, 3.2.2.50, 4 storey, fire alarm, sprinklered throughout, standpipes in exits. Building area for code purposes for building is 1094.49 m2. Total gross floor areas (including stairwells and elevators) per 1st storey = 1094.49 m2 ; 2nd storey 1079.44 m2; 3rd storey 1079.44 ; 4th storey 1079.44 m2. Key FRR /FS are 1 Hour FRR/FS 50 STM between residential suites, 1 Hour FRR/FS for public corridor, floor assemblies and loadbearing supports. storage rooms, exit stairs, elevators and machine room ; All doors in fire separations to be self-closing with positive latching mechanisms. Rated roof provided for termination of the partywalls/rated walls. Vertical service spaces 45 min FS/FRR. Alternative solution report (sprinkler protection of glazing in the 1 hr fire separation between the lobby and the 2nd storey) |
Application Status: | COMPLETED |
Permit Value: | $3,689,998.40 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | September 15, 2015 |
File Close Date: | August 30, 2016 |
Expiry Date: | September 15, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
6330 MCROBB AVENUE | R8 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | CANCELLED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2016-08-30 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.