BP120734 - 50 Tenth Street - Drawings Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120734 - 50 Tenth Street - Drawings Scanned | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 50 Tenth Street - Drawings Scanned |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP120734 |
Date Application Submitted: | April 07, 2015 |
Application Description: |
Facade Canopy Improvements to Southgate Mall: Clad all existing exterior HSS columns for canopy roof with stone veneer and concrete caps. Install new fibre cement lapped siding and metal cap flashings on canopy gable ends. 2006 Code: Existing Building is divided by two firewalls into three buildings. 1st building, East end, Group E, 3.2.2.62, 1492 m2; 2nd building (unsprinklered) -Group E/A2 , 3.2.2.61/3.2.2.28 sentence 2, 722 m2; 3rd building, West end - Group E, 3.2.2.62, 1417m2. All buildings combustible construction, bldg 1 & 3 sprinklered with fire alarm system. Aug 18,2015 - REVISION: Add Structural Engineer for replacement of canopy columns. |
Application Status: | COMPLETED |
Permit Value: | $85,000.00 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | April 20, 2015 |
File Close Date: | June 30, 2016 |
Expiry Date: | April 20, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
50 TENTH STREET | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-06-30 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.