BP120671 - 130 Vancouver Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP120671 - 130 Vancouver Avenue | |
|---|---|
| Neighbourhood: | Newcastle/Brechin | 
| Street Address: | 130 Vancouver Avenue | 
| Type of Application: | Commercial / Multi / Industrial | 
| File Number: | BP120671 | 
| Date Application Submitted: | March 11, 2015 | 
| Application Description: | 17 Dwelling units, (Apartment Building). Building classification 3.2.2.50, Four storey, Group C, combustible construction, sprinklered/ fire alarm system. Lower storey open-air storage garage with 3 floors of residential occupancy, Total area of building 1544m2. 1 hr FS/FRR/50 STM for floor/ceiling assemblies, partywalls between suite,service rooms,exit stairwells and public corridors. 1.5 hr FS/FRR required between Storage garage and remainder of building. All corridor/suite doors in fire separation walls to be self closing,20 min labelled doors. Oct 17,2017 - REVISION: New Mech/Plumbing P. Eng, D.Pederson of Rocky Point Eng Ltd. | 
| Application Status: | COMPLETED | 
| Permit Value: | $1,795,209.00 | 
| Builder: | WINDLEY CONTRACTING LTD | 
| Issued Date: | May 17, 2016 | 
| File Close Date: | November 16, 2017 | 
| Expiry Date: | May 17, 2018 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 130 VANCOUVER AVENUE | COR2 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | FAILED | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| UNDERSLAB PLUMBING complete underslab plumbing must be visible. | PASSED | 
| SANITARY CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| ROUGH IN SPRINKLER Rough in sprinkler must be complete and visable for inspection. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PARTIAL | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PASSED | 
| MONITORING FIELD REVIEW A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. | PASSED | 
| SPRINKLER FINAL-OLD Sprinkler system must be complete and operating as intended. | PASSED | 
| PLUMBING FINAL-OLD All fixtures must be in place. | PASSED | 
| APPROVAL-FIRE-OLD Approval required prior to Occupancy | COMPLETED | 
| OCCUPANCY-OLD | CANCELLED | 
| OCCUPANCY-OLD | FAILED | 
| OCCUPANCY-OLD | PASSED 2017-11-16 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        