BP120541 - 241 Skinner Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120541 - 241 Skinner Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 241 Skinner Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP120541 |
Date Application Submitted: | January 08, 2015 |
Application Description: |
241 Nighclub - ~366m2 sprinklered with fire alarm, one storey with mezzanines, no exiting changes, basement and crawl space Interior renovation to existing nightclub. Reconstruction and new location of bar . Egress route through bar area to be marked on floor. Raising the floor in the sunken area. Removal of existing stairs and adding two new stairways in reduced sunken area complete with handrails. Adding sink to existing mini bar. Adding 4 new sinks and 2 glass washers to relocated bar. Changing existing offices to seating areas on the main and the upper floor enclosed mezzanine. New stairway to seating on upper mezzanine. Reducing size of coat closet. Removing area of refuge from west side exit . All new stairs, guards and handrails. to comply with 3.3 ,3.4 , 3.8 of BCBC 2012. Revised March 30, 2015 - changed stairs location, 3 risers @ 5", 12" treads and Handrails with 12" horizontal extentions. |
Application Status: | COMPLETED |
Permit Value: | $20,000.00 |
Building Area: |
307.60 M2 3,310.98 ft2 |
Issued Date: | March 03, 2015 |
File Close Date: | February 11, 2016 |
Expiry Date: | March 03, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
241 SKINNER STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-02-11 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.