BP120338 - 201 70 Commercial
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120338 - 201 70 Commercial | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 201 70 Commercial |
Type of Application: | Leasehold Improvements |
File Number: | BP120338 |
Date Application Submitted: | November 21, 2014 |
Application Description: |
Landlords Work.Unit 201, Quintessential Fashion, Area = 181m2, Group E, One New Universal washroom. Adding Changing rooms, Ensure at least one change room is 1500mm x 1500mm. Service penetration (coring) within the slab for New Universal washroom. Fire stopping system for piping transition between the parking garage level & this level by Alternative solution. Sprinkler changes. Single exit door. Existing 1 hr FRR/FS between Suites & 2 hr to VICC Existing building description. Vancouver Island Conference Centre - 3 storeys with basement - basement & 1st storey contain parking (Group F3),retail space (Group E) & Museum/Conference entry.The 2nd storey contains museum,meeting space, retail (E) & conference support spaces (Group A2).The third storey contains the main conference areas & auditorium (Group A2). Non-combustible construction, sprinklered with fire alarm 3.2.2.57, Group E most restrictive & 3.2.2.24 Group A & 3.2.2.75 Group F3 Bldg area (for code) 5820m2 footprint. |
Application Status: | COMPLETED |
Permit Value: | $25,000.00 |
Building Area: |
181.00 M2 1,948.27 ft2 |
Issued Date: | December 29, 2014 |
File Close Date: | March 20, 2015 |
Expiry Date: | December 28, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
70 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2015-03-20 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.