Application Description: |
Hair salon, Unit #103 , Group D, 154m2 , Accessible for persons with disabilities. One new universal washrooms provided. 1 staff washroom ,washer/dryer, 2 other sinks in separate rooms. Sprinkler changes at rear . Existing 2 hr. FRR/FS floor assemblies and 1 hr. FRR/FS suite separations Building classification 3.2.2.23 (Group A2) 3.2.2.49 (Group D) and 3.2.2.57 (Group E), all unlimited building area, non-combustible construction, 2 hour FRR/FS floor assemblies, 2 Storey Sprinklered/Fire Alarm, 2,351.8 m2 (1st storey) and 2,221.8 m2 (2nd storey). Total area = 4,573.6 m2 . xref BP117610 |
Application Status: | COMPLETED |
Permit Value: | $70,000.00 |
Building Area: |
154.00 M2 1,657.64 ft2 |
Builder: | ANKIDO HOLDINGS LTD |
Issued Date: | November 06, 2014 |
File Close Date: | January 09, 2015 |
Expiry Date: | November 07, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
650 TERMINAL AVENUE | DT6 , DT6 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2015-01-09 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.