BP120217 - 607 Seventh Street- Drawings Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120217 - 607 Seventh Street- Drawings Attached | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 607 Seventh Street- Drawings Attached |
Type of Application: | Garage / Carport Permit |
File Number: | BP120217 |
Date Application Submitted: | October 02, 2014 |
Application Description: |
Building a detached 30'x47' garage with engineered foundation. Remove existing garage/carport from SFD. Revision 1: 2014-12-04-Added Geotechnical supervision to project.(Schedule B) Revision 2: Dec 11, 2014-- Building re located on lot. New survey with new location and retaining walls. Structural Engineer deleted from project. Revision 3: Jan 21, 2015 -- Delete windows and change garage door to 10' |
Application Status: | COMPLETED |
Permit Value: | $40,000.00 |
Building Area: |
130.99 M2 1,409.96 ft2 |
Issued Date: | November 20, 2014 |
File Close Date: | March 02, 2015 |
Expiry Date: | November 21, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
607 SEVENTH STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
FAILED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2015-03-02 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.