Application Description: |
Code Brew - Unit 102- complete and occupy - 186 m2, Group A2, Occupant load 50 persons, 2 universal washrooms. Class 2 Cooking Operations (non-grease). Existing FS/FRR installed under base building. 2 hr. FS/FRR Vertical suite separation provided between this unit and adjacent unit 103, 1 hr required D-A2 , 0 hr. FS/FRR public corridors, 1 hr. FRR/FS for floor assembly between 1st/2nd floors, Building designed to 3.2.2.65 Group E, 3.2.2.24, Group A2 and 3.2.2.59 Group D superimposed major occupancies. 3 storey, non-combustible construction, sprinklers and fire alarm. 1 hour FRR/FS floor assembly required above the first storey including supporting construction. O Hr. FRR/FS required above the second storey and roof. 1.5 hrs FRR/FS to parking garage. 2763 m2 total on 3 floors, with 1353m2 parking garage(BCBC building area =2274 m2) |
Application Status: | COMPLETED |
Permit Value: | $150,000.00 |
Building Area: |
186.00 M2 2,002.09 ft2 |
Builder: | RW (BOB) WALL LTD |
Issued Date: | October 30, 2014 |
File Close Date: | December 17, 2014 |
Expiry Date: | October 31, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
101 1621 DUFFERIN CRESCENT | CC5 | Property Report |
1621 DUFFERIN CRESCENT | CC5 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2014-12-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.