Application Description: |
Tim Hortons Renovation to existing interior and exterior. New equipment , new counters, new plumbing fixtures. changing public area millwork , changes to the interior finishing , new accessibile door opener, new storefront door and changes to the exterior facade. Occupant load of 60 plus 5 staff. 1 male washroom, 1 female washroom and 1 universal washroom , plus 1 staff washroom. provide one seat area for wheelchair customers. Building Description: Tim Horton's - Part 3 Building , sprinklered with fire alarm system, Group A Division 2, Building area = 283 m2. Buliding Classification = 3.2.2.28, combustible construction, Occupant load 66. Accessible washroom to comply with 3.8. three exits provided. Provide accessible seating for 1% of the seating area. |
Application Status: | COMPLETED |
Permit Value: | $390,460.75 |
Building Area: |
283.00 M2 3,046.18 ft2 |
Builder: | DILLON CONSULTING LIMITED |
Issued Date: | September 15, 2014 |
File Close Date: | February 06, 2015 |
Associated Properties
Address | Zone | More |
---|---|---|
15 WALLACE STREET | DT3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2015-02-06 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.