BP120135 - 71 Strickland Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP120135 - 71 Strickland Street
Neighbourhood: South End    
Street Address: 71 Strickland Street
Type of Application: Locate Permit
File Number: BP120135
Date Application Submitted: September 04, 2014
Application Description: Relocation of dwelling from Victoria, new lower floor. New kitchen and truss repair to existing structure.

Revision: Sept 11, 2015 -- Change interior stair direction, changed layout to bedroom #4 and eliminated some counter space.
Application Status: COMPLETED
Permit Value: $148,349.91
Building Area: 206.71 M2
2,225.01 ft2
Issued Date: October 21, 2014
File Close Date: December 14, 2015
Expiry Date: October 21, 2016

Associated Properties

Address Zone More
71 STRICKLAND STREET R1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concete.

PASSED
STORM CONNECTION

Pipe connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe Connection must be visible for inspection.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
INSULATION

Rough in sprinkler must be complete and visible for inspection.

PASSED
PAPER/FLASHING/WATERPROOFING

To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire.

FAILED
PAPER/FLASHING/WATERPROOFING

To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire.

PARTIAL
PAPER/FLASHING/WATERPROOFING

To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire.

FAILED
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy