BP119997 - 3583 Bonnie Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP119997 - 3583 Bonnie Drive
Neighbourhood: Hammond Bay    
Street Address: 3583 Bonnie Drive
Type of Application: Garage / Carport Permit
File Number: BP119997
Date Application Submitted: July 21, 2014
Application Description: Build Garage extension and convert part of exisitng garage to living space. (Theater Room)
Revision 2014-DEC-17, Owner is now the General Contractor for this file. Christopher L Projects has been removed as builder from this project...MLB
Revision 2015-JAN-26, Add window and door to garage....MLB
Application Status: COMPLETED
Permit Value: $35,220.00
Building Area: 43.50 M2
468.23 ft2
Issued Date: August 25, 2014
File Close Date: August 29, 2016
Expiry Date: August 24, 2016

Associated Properties

Address Zone More
3583 BONNIE DRIVE R1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
FINAL-OLD

Final Approval as per requested on plans.

FAILED
FINAL-OLD

Final Approval as per requested on plans.

PASSED

2016-08-29

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy