BP119965 - 191 Cilaire Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119965 - 191 Cilaire Drive | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 191 Cilaire Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP119965 |
Date Application Submitted: | July 14, 2014 |
Application Description: |
Right Side: add to existing carport and enclose both existing and new addition to create an office/bedroom. Left Side: add to existing carport and enclose both existing and new addition to create a garage, mudroom and laundry room. Construct new roof over existing entrance to SFD. Revision 1: Add 2' bump out and remove garage door - Aug. 25/2014 Revision 2: Sept 29, 2014 -- Change sizes to windows and doors, and add plumbing fixtures. |
Application Status: | COMPLETED |
Permit Value: | $94,759.00 |
Building Area: |
86.40 M2 930.00 ft2 |
Issued Date: | August 19, 2014 |
File Close Date: | December 23, 2014 |
Expiry Date: | August 19, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
191 CILAIRE DRIVE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-12-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.