BP119881 - 2124 Lakeside Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119881 - 2124 Lakeside Drive | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 2124 Lakeside Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP119881 |
Date Application Submitted: | June 18, 2014 |
Application Description: |
Attached Shop/sundeck. Drawings attached. Revision: Jan 13, 2015 -- Addition of 972 sq. ft. of attached garage. Revision: Feb 24/17 - insulation/VB removed from scope of work REVISION: 2017-Nov-08 - Insulation within scope of work once again, relocate window, delete door in garage and remove exterior stairs. BAL |
Application Status: | COMPLETED |
Permit Value: | $79,326.52 |
Building Area: |
166.15 M2 1,788.42 ft2 |
Issued Date: | August 01, 2014 |
File Close Date: | May 30, 2018 |
Expiry Date: | August 01, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
2124 LAKESIDE DRIVE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2018-05-30 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.