BP119556 - 1588 Boundary Crescent (Units 6 - 10)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119556 - 1588 Boundary Crescent (Units 6 - 10) | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 1588 Boundary Crescent (Units 6 - 10) |
Type of Application: | Leasehold Improvements |
File Number: | BP119556 |
Date Application Submitted: | March 20, 2014 |
Application Description: |
UNIT- 6 - combining units 6-10 Kidney Care Clinic (VIHA) Group D, accessible - 332.87 m2, (existing 6-9), 2 exits required, exits at front with a min of 9 meters between the exits. One exit is through existing 45 min FRR/FS exit corridor and demising wall. Adding 1 washroom and 1 universal washroom, 8 sinks in clinic rooms, accessible section at reception desk to be provided. Kidney Care Clinic (classroom) (VIHA) Group D, 82.8 m2, (existing 10) south building, 1 exit required, exits at front , meets distance for single exit. 45 min FRR roof rating. Occupant load = 30 persons. 2 universal washooms. Existing, unsprinklered combustible buildings. See Bp101074 for equivalency report. North building = 713 m2 ~Area recalcuated under BP116252. Two storey, Group E and D, joined by an existing unenclosed walkway between buildings. Two storey, South building Group E/D and A2, 3.2.2.25 (current code reference) 1245m2~. (by existing equivalency under BP101074 (1998 code) |
Application Status: | COMPLETED |
Permit Value: | $361,500.00 |
Building Area: |
415.67 M2 4,474.23 ft2 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | April 24, 2014 |
File Close Date: | August 20, 2015 |
Expiry Date: | April 25, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
1588 BOUNDARY CRESCENT | CC5 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2015-08-20 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.