BP119470 - 400 Madsen Road Main Building
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119470 - 400 Madsen Road Main Building | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 400 Madsen Road Main Building |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP119470 |
Date Application Submitted: | December 18, 2013 |
Application Description: |
Main building - inspections only. Main Building - 7931m2 total floor area. Main building - 3.2.2.75, sprinklers, comb. or noncombust., floors 45 min FRR, mezzanine 45 min FS if combustible, loadbearing members supporting assembly with a FRR - 45 min FRR or noncombust., loadbearing members supporting a FS - FRR not less than required FS. Refer to approved plans for required fire separations between spaces (warehouse, storage and repair garages). |
Application Status: | COMPLETED |
Builder: | OMICRON ARCHITECTURE ENGINEERING CONSTRUCTION LTD |
Issued Date: | June 25, 2014 |
File Close Date: | April 07, 2022 |
Expiry Date: | June 25, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
400 MADSEN ROAD | AR1 , I3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | PARTIAL |
OCCUPANCY-OLD | PARTIAL |
OCCUPANCY-OLD | PARTIAL |
OCCUPANCY-OLD |
PASSED
2022-04-07 |
OCCUPANCY |
PASSED
2022-06-14 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.