BP119467 - 223 Commercial Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119467 - 223 Commercial Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 223 Commercial Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP119467 |
Date Application Submitted: | February 25, 2014 |
Application Description: |
Phase 3: Complete and occupy (C/O) Group A2 (Restaurant, Kitchen and Staff room on the first storey) and the offices on the second and third storey. Includes for C/O for the office space on the first storey. This permit includes professional engineering for sprinklers , plumbing and mechanical (kitchen exhaust systems) x reference BP118189 for fire separation/fire resistance ratings and base building . Added on May 15, 2014 c/o for Office on the Main Floor and new universal washroom Heritage Building, 3 Storeys, Sprinklered, Fire Alarm, First storey, Group A2/ D = 420.38 m2; Second Storey, Group D = 399.39 m2; Third floor, Group D = 376.81 m2. Roof top stairs enclosure = 16.16 m2. Roof-top open deck area = 72.55 m2 Total Building Area =1212 m2. Alternative solutions for unprotected openings, exposed wall face, glazed exit on second and third floor and construction type for A2 under BP118189. |
Application Status: | COMPLETED |
Permit Value: | $492,000.00 |
Building Area: |
1,197.00 M2 12,884.39 ft2 |
Builder: | RW (BOB) WALL LTD |
Issued Date: | March 28, 2014 |
File Close Date: | July 23, 2014 |
Expiry Date: | March 28, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
223 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-07-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.