BP119453 - 1451 Estevan Road (new address 1461 Estevan)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119453 - 1451 Estevan Road (new address 1461 Estevan) | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 1451 Estevan Road (new address 1461 Estevan) |
Type of Application: | Leasehold Improvements |
File Number: | BP119453 |
Date Application Submitted: | February 20, 2014 |
Application Description: |
Vancouver Island Health Authority Financial Offices Interior Tenant Improvement- 1st, 2nd, 3rd storey = 374.96 m2 per floor, Total gross floor area including elevators, stairs, shafts = 1123.8 m2; 1st storey: 2 universal washrooms, Janitors room with 0 hr FS; Exit Lobby 0 Hr. FS; offices/storage rooms partitions walls. 2nd storey: 2 universal washroom one with shower, one washroom, Janitors room with 0 hr FS; staff rm/with sink/dishwasher, offices/meeting rooms; 3rd storey: 2 universal washroom, Janitor room with 0 hr. FS, offices. Xreference BP118928 for the shell building (includes exit stairways, shafts, elevator/elevator machine room, boiler room , service room. exit lobby) . Building Description: 3 storey building , sprinklered with fire alarm , 3.2.2.59, Floor assemblies and loadbearing supports constructed with noncombustible materials 0 FS required, 1 hr. provided. Elevator , exits, 45 min FS/FRR., Main floor Lobby 0 hr FS, x reference BP118639. |
Application Status: | COMPLETED |
Permit Value: | $375,000.00 |
Building Area: |
1,123.80 M2 12,096.47 ft2 |
Issued Date: | May 02, 2014 |
File Close Date: | October 31, 2014 |
Expiry Date: | May 02, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
1451 ESTEVAN ROAD | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2014-10-31 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.