BP119446 - 2558B Nadely Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119446 - 2558B Nadely Crescent | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 2558B Nadely Crescent |
Type of Application: | Accessory Building |
File Number: | BP119446 |
Date Application Submitted: | February 18, 2014 |
Application Description: |
To construct 911 sq ft slab on grade, carriage house. Sept 5/14 - revision: adding 2 - 2'0x1'0 rake windows to front. mv |
Application Status: | COMPLETED |
Permit Value: | $150,000.00 |
Building Area: |
84.63 M2 910.95 ft2 |
Builder: | ISLAND RED CEDAR CONSTRUCTION LTD |
Issued Date: | April 07, 2014 |
File Close Date: | September 12, 2014 |
Expiry Date: | April 06, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
2558 NADELY CRESCENT | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection. |
CANCELLED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection. |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-09-11 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.