BP119389 - 679 Terminal Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119389 - 679 Terminal Avenue | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 679 Terminal Avenue |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP119389 |
Date Application Submitted: | January 31, 2014 |
Application Description: |
Part 9, Two storey, Mixed-use building, sprinklered with fire alarm, first storey 450 m2 (existing 290.97m2), second storey 311m 2. First storey divided into 3 "Shell"" Group D" suites, with a 1 hr fire resistance rating/fire separation (FRR/FS) provided between the 1st storey units and one hour FRR/FS/50 STM provided between the first and second storey. Shell "Group D" 1st storey: #101=127.88 m2 (single exit); #102= 194.26 m2 (2 exits); #103 = 117.17 m2 (single exit); 2nd storey divided into 3 residential dwelling units with a one hour FRR/FS/50 STM between units and between 1st and 2 nd storey. Exiting from Residential units via rear exit stairs, openings in 1st storey protected with wired glass in steel frames. Residential #201 = 92.86 m2, #202 = 145.8 m2, #203 = 92.86 m2. (NOTE:Units #201 & #203 increased in sized by 9.985m2 each(total 19.97m2) for new permit.)Revised drawings 6/17/14 REVISION: Aug 08- 2014, New elevation drawings approved by Gary Noble for DP 000667 |
Application Status: | HOLDBACK |
Permit Value: | $1,222,500.00 |
Building Area: |
20.63 M2 222.06 ft2 |
Builder: | ENERGETIC CITY DEVELOPMENTS LTD |
Issued Date: | March 11, 2014 |
File Close Date: | December 16, 2014 |
Expiry Date: | March 11, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
103 679 TERMINAL AVENUE N | COR2 | Property Report |
102 679 TERMINAL AVENUE N | COR2 | Property Report |
101 679 TERMINAL AVENUE N | COR2 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
SCHEDULED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-12-16 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.