BP119344 - 5898 McKnight Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP119344 - 5898 McKnight Place | |
|---|---|
| Neighbourhood: | North Slope | 
| Street Address: | 5898 McKnight Place | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP119344 | 
| Date Application Submitted: | January 20, 2014 | 
| Application Description: | For construction of a two storey single family dwelling with secondary suite on slab on grade. April 28, 2014 - Revise suite layout, bathroom and kitchen. Delete suite window on left elevation. Delete 4x4 window in ensuite bathroom add 2x3 window above tiolet. Revise layout of main bathroom. Add 2x5 transom window on left elevation in living room.Revise garage BWP's location. Revision: May 5, 2014-- Extend BWP and delete a panel in garage wall. Relocate wall adjoining suite and media room. | 
| Application Status: | COMPLETED | 
| Permit Value: | $346,919.62 | 
| Building Area: | 306.58 M2 3,300.00 ft2 | 
| Builder: | 0978993 BC LTD | 
| Issued Date: | February 18, 2014 | 
| File Close Date: | September 08, 2014 | 
| Expiry Date: | February 18, 2016 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 5898 MCKNIGHT PLACE | R10 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| EXCAVATION Excavation of soil, prior to placing forms. | FAILED | 
| EXCAVATION Excavation of soil, prior to placing forms. | PARTIAL | 
| EXCAVATION Excavation of soil, prior to placing forms. | CANCELLED | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | CANCELLED | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PARTIAL | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | CANCELLED | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PARTIAL | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | PASSED | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | FAILED | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete | PASSED | 
| STORM CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| SANITARY CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| WATER CONNECTION Pipe and Connection must be visable for inspection | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | CANCELLED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | CANCELLED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | FAILED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PARTIAL | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | FAILED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | FAILED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PARTIAL | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PARTIAL | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | FAILED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | FAILED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | PASSED 2014-08-29 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        