BP119249 - 6902 Island Hwy - (parent 6900 Island Highway)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119249 - 6902 Island Hwy - (parent 6900 Island Highway) | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6902 Island Hwy - (parent 6900 Island Highway) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP119249 |
Date Application Submitted: | December 16, 2013 |
Application Description: |
Cabela's Alteration and addition to existing building - Group E- Accessible, One storey with mezzanine, non-combustible/combustible building, Building area ( BCBC) = 6,860 m2, Main floor area: 5,920.5 m2, office mezzanine 496.7 m2 , addition at front 13.88m2 . Sprinklered to NFPA 13, Fire alarm system, Bldg classification 3.2.2.65, 0 hr non combustible floor assembly for enclosed mezzanine = 496.7m2 = 8.4% of floor area, 45 min FRR/FS exit enclosure provided for office mezzanine, Service(electrical) mezzanine 109m2. New vaulted entrance roof and combustible canopy at front of building. Removing Greenhouse. 464.5m2 Removing ~290m2 of existing multi-level storage system. 2014-03-10 - Revision Shifted customer pick-up door from Gridline G-O to existing loading dock door opening at Gridline F-8 . Revised roof framing per joist substitution request. Revised Landscaping. Provided engineering details for tree and mountain. |
Application Status: | COMPLETED |
Permit Value: | $9,600,000.00 |
Building Area: |
6,526.20 M2 70,247.36 ft2 |
Builder: | LEDCOR CONSTRUCTION LIMITED |
Issued Date: | February 19, 2014 |
File Close Date: | August 28, 2014 |
Expiry Date: | February 19, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
6900 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-08-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.