BP119202 - 2480 Cosgrove Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP119202 - 2480 Cosgrove Crescent | |
|---|---|
| Neighbourhood: | Departure Bay | 
| Street Address: | 2480 Cosgrove Crescent | 
| Type of Application: | Single / Two Family Alteration | 
| File Number: | BP119202 | 
| Date Application Submitted: | December 02, 2013 | 
| Application Description: | Creating 580 sq. ft one bedroom legal  secondary suite on lower level. April 07-2014 - REVISION: Move exterior wall with overhead garge door for suite extiorer entry door to exit to exterior. Add 1 HWT in suite closet. Change location of W/D in laundry room. Relocatee bedroom and bathroom interior doors in suite area. Re & Re windows in kitchen area. | 
| Application Status: | COMPLETED | 
| Permit Value: | $20,000.00 | 
| Issued Date: | December 20, 2013 | 
| File Close Date: | July 24, 2014 | 
| Expiry Date: | December 20, 2015 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 2480 COSGROVE CRESCENT | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| ROUGH IN PLUMBING Rough In plumbing must be complete including water piping. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| PLUMBING FINAL-OLD All fixtures must be in place. | CANCELLED | 
| FINAL-OLD Final approval as per requirements on plans. | PASSED 2014-07-24 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

