BP118951 - 2295 Ashlee

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP118951 - 2295 Ashlee
Neighbourhood: Westwood    
Street Address: 2295 Ashlee
Type of Application: Garage / Carport Permit
File Number: BP118951
Date Application Submitted: September 13, 2013
Application Description: To construct 14 x 24 accessory building, c/w 2 pcs bathroom.

Revision: Dec 10, 2013-- Move man door and location of bathroom. removed window on rear of building.

Application Status: COMPLETED
Permit Value: $23,600.91
Building Area: 31.21 M2
335.94 ft2
Issued Date: September 13, 2013
File Close Date: March 12, 2014
Expiry Date: September 14, 2015

Associated Properties

Address Zone More
2295 ASHLEE ROAD R1A Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
ROUGH IN PLUMBING

Pipe and connection must be visable for inspection.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
FINAL-OLD

Final Approval as per requested on plans.

FAILED
FINAL-OLD

Final Approval as per requested on plans.

PARTIAL
FINAL-OLD

Final Approval as per requested on plans.

PASSED

2014-03-12

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy