BP118950 - 2329 ARBOT ROAD

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP118950 - 2329 ARBOT ROAD
Neighbourhood: Westwood    
Street Address: 2329 ARBOT ROAD
Type of Application: Single / Two Family Alteration
File Number: BP118950
Date Application Submitted: September 12, 2013
Application Description: Addition to connect both existing SFD's, c/w firewall for separation. Adding Secondary Suite to SFD.

Revision: Jan 13, 2014
1) Delete R-20 spray foam insulation in 2x4 walls and replace with R-12 batt insulation c/w 6 mil poly V.B.

2) Delete batt insulation and V.B. to ceiling area under roof deck and add spray foam insulation. (Material product data sheet required at inspection)

3) Change torch on roofing to vinyl deck surface.



Application Status: COMPLETED
Permit Value: $550,000.00
Building Area: 358.38 M2
3,857.57 ft2
Builder: PHEASANT HILL HOMES LTD
Issued Date: October 24, 2013
File Close Date: July 25, 2014
Expiry Date: October 24, 2015

Associated Properties

Address Zone More
2329 ARBOT ROAD AR2 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2014-07-25

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy