BP118856 - 1881 Dufferin Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118856 - 1881 Dufferin Crescent | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 1881 Dufferin Crescent |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP118856 |
Date Application Submitted: | August 16, 2013 |
Application Description: |
New office building - Island Optimal Health and Performance/Moksha Yoga Nanaimo. 319m2 two storey building, Group A2/D designed to 3.2.2.26. 319m2 on the main and 220m2 on the second storey. Single tenancy, interconnected floor space, combustible construction permitted, 45 min rated floors, combustible loadbearing construction and exit required 1 hr provided. Accessible on the first floor only. Occupant Load 110 persons total, not more than 60 persons on the second storey. Occupant load and washroom (room 110) revised. 2015-Jan-05 BAL |
Application Status: | COMPLETED |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | May 06, 2014 |
File Close Date: | January 12, 2015 |
Expiry Date: | May 06, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
1881 DUFFERIN CRESCENT | I3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2015-01-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.