BP118705 - 4960 Songbird Place - DRAWINGS SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118705 - 4960 Songbird Place - DRAWINGS SCANNED | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 4960 Songbird Place - DRAWINGS SCANNED |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP118705 |
Date Application Submitted: | June 20, 2013 |
Application Description: |
3 storey wood frame residential (63 Units) building with underground parking. Parking garage - 2204m2, including a 43m2 storage room and 12.5m2 mechanical room, 1st Storey - 1946m2, 2nd Storey - 1946m2, Third Storey - 1871m2. Total building area 7,967m2. Group C occupancy designed to 3.2.2.50, 3 storey, maximum building area 2400m2, 1 hour rated floors, 1.5 hours at parking garage, 1 hour at roof, 1 hour at residential suites, Mechanical Room, Electrical Room, Garbage, Recycling, Tenant and Bike Storage 1 hour. Elevator and Exit stair shafts 1.5 hour at parking garage and 1 hour at residential floor levels. Alternative Solution Report provided for exit door protection at two locations. Water curtain sprinklers will be provided at 4 windows. |
Application Status: | COMPLETED |
Permit Value: | $6,000,000.00 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | June 04, 2014 |
File Close Date: | May 22, 2015 |
Expiry Date: | June 04, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
4960 SONGBIRD PLACE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
CANCELLED |
OCCUPANCY-OLD | PARTIAL |
OCCUPANCY-OLD |
PASSED
2015-05-22 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.