BP118692 - 3342 Stephenson Pt Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118692 - 3342 Stephenson Pt Road | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3342 Stephenson Pt Road |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP118692 |
Date Application Submitted: | June 14, 2013 |
Application Description: |
Construction of a two storey, slab on grade, single family dwelling Revision 1: Nov 22, 2013-- Siting of the garage changed. Revision 2: Sept 30, 2014 -- Secondary/Nanny suite is eliminated from the scope of the permit. 6' counter with 12" bar sink allowed. No upper cabinets and no 220v outlets. |
Application Status: | COMPLETED |
Permit Value: | $980,000.00 |
Building Area: |
517.61 M2 5,571.50 ft2 |
Builder: | COLLINS CUSTOM CONTRACTING CORP |
Issued Date: | July 24, 2013 |
File Close Date: | February 12, 2015 |
Expiry Date: | July 24, 2015 |
Associated Properties
Address | Zone | More |
---|---|---|
3342 STEPHENSON POINT ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
MONITORING FIELD REVIEW | PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2015-02-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.