BP118667 - 6800 Island Highway N - SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118667 - 6800 Island Highway N - SCANNED | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6800 Island Highway N - SCANNED |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP118667 |
Date Application Submitted: | June 06, 2013 |
Application Description: |
Detail Bay addition - Woodgrove Chrysler Proposed addition 79.5 M2 Total building area 1001 M2 Revised Structural Drawings received and approved. 2013-Jun-27 Group F-2 building designed to 3.2.2.76. Any additional floor area increase will require reclassification of the building. |
Application Status: | COMPLETED |
Permit Value: | $190,000.00 |
Builder: | WESTMARK CONSTRUCTION LTD |
Issued Date: | June 25, 2013 |
File Close Date: | October 31, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
6800 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-10-31 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.