BP118497 - 1890 Boxwood - Arbutus Distilleries Inc., Micro-Distillery
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118497 - 1890 Boxwood - Arbutus Distilleries Inc., Micro-Distillery | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 1890 Boxwood - Arbutus Distilleries Inc., Micro-Distillery |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP118497 |
Date Application Submitted: | April 04, 2013 |
Application Description: |
Arbutus Distilleries Inc., Micro-Distillery, Part 3 Building , 2 Storeys, Sprinklered, Mixed Construction, Fire Alarm System, 1st storey, Industrial (Group F2) occupancies, Subsidiary Retail Group E for tasting and sales. Future tenant space requires separate permit(s). 2nd Storey, Industrial (Group F2)Storage. 1st Storey = 632 m2, 2nd Storey = 112 m2, Construction Article 3.2.2.77, 45 min FRR/FS for floor assembly and 45 min. for loadbearing supports and 45 min. FRR/FS for 2nd storey wall separation. Alternative solutions to building code compliance related to classification under BCBC sentence 3.1.2.1.(1) and Fire Code sentence 4.10.2.1(1) for a distillery and the fire resistance ratings for the building faces per sentence 3.2.3.7 (1)at the north and the south face by use of an active fire suppression system. |
Application Status: | COMPLETED |
Permit Value: | $400,000.00 |
Issued Date: | June 26, 2013 |
File Close Date: | December 24, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
1890 BOXWOOD ROAD | I2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2013-12-24 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.