Application Description: |
Phase 2: Renovation to existing 2 storey building and addition of a 3rd third storey with roof deck area. Building description: B.C.B.C. 2006, Heritage Building, 3.2.2.24 - 3 Storeys, Sprinklered, Fire Alarm, Part 3 Building: First storey, Group A2/Group D = 420.38 m2; Second Storey, Group D = 399.39 m2; Third floor, Group D = 376.81 m2. Roof top stairs enclosure = 16.16 m2. Roof-top open deck area = 72.55 m2 Total Building Area =1212 m2. Providing 1 hr. FRR/FS per A1.1.1.1.between A2/E Alternative solutions: Solutions A-D. x-reference BP 117968 for front facade renovation and BP 118485 for the interior demolition permit and bp119467 for Complete and occupy. 2014/05/13 added small office on main floor with universal washroom., minor partition changes on 2nd and 3rd floor .Xreference bp119427 |
Application Status: | HOLDBACK |
Permit Value: | $900,000.00 |
Building Area: |
1,197.00 M2 12,884.39 ft2 |
Builder: | RW (BOB) WALL LTD |
Issued Date: | June 12, 2013 |
File Close Date: | July 23, 2014 |
Expiry Date: | June 12, 2015 |
Associated Properties
Address | Zone | More |
---|---|---|
223 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-07-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.