BP118102 - 1911 Wilfert Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118102 - 1911 Wilfert Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 1911 Wilfert Road |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP118102 |
Date Application Submitted: | December 06, 2012 |
Application Description: |
Additions on front of building and removal of mezzanine. Two new washrooms one of which meets requirements of universal toilet room. Building classification existing Assembly ocupancy 3.2.2.25 BCBC 2012. 45 min rated roof and supporting assemblies (addition) 45min. rated/non combustible cladding exposed building face of east elevation (addition) 1Hr rated/non cumbustible cladding exposed building face west elevation (addition). Occupant load of 68 based on Architects Letter applies only to this occupancy-Flipside Gymnastics Revisiosn April 8/2013 plumbing isometrics recieved. Revision June 13, 2013 Revised structural and architectural drawings recieved for foundations. Revsion July 22, 2014: Excavate interior pit in order to construct "sprung floor" for gymnastics. Revised Architectural and Structural drawings provided. Schedule B from B McClure, P. Eng.,Structural Engineer. |
Application Status: | COMPLETED |
Issued Date: | April 16, 2013 |
File Close Date: | December 15, 2014 |
Expiry Date: | April 16, 2015 |
Associated Properties
Address | Zone | More |
---|---|---|
1911 WILFERT ROAD | I1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-12-15 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.