BP118073 - 3474 Santa Fe - SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118073 - 3474 Santa Fe - SCANNED | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 3474 Santa Fe - SCANNED |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP118073 |
Date Application Submitted: | November 23, 2012 |
Application Description: |
For construction of a three storey single family dwelling with an attached double garage. Revision: July 16, 2013-- Add/Remove and change window sizes, Move laundry from main floor to basemant, extend deck and add landing and stairs off the rear deck, change french doors to slider. |
Application Status: | COMPLETED |
Permit Value: | $340,667.41 |
Building Area: |
339.92 M2 3,658.86 ft2 |
Builder: | R DOLAN CONSTRUCTION LTD |
Issued Date: | December 28, 2012 |
File Close Date: | November 26, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
3474 SANTA FE PLACE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2013-11-26 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.