BP118015 - 6572 Golden Eagle -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118015 - 6572 Golden Eagle -- Scanned | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6572 Golden Eagle -- Scanned |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP118015 |
Date Application Submitted: | November 02, 2012 |
Application Description: |
For construction of a two storey single family dwelling with an attached double garage. Revision: 2012-12-31.Lower Level: Changing multiple windows. New interior door to 3 piece rough in bathroom. New exterior door roughed in and covered over for future suite. Upper level: Moving Interior Garage door. Changing multiple windows and Tempering some( see plan), Changing to 12'x8"'sliding glass door with transom above, truss plan for new beam with package. Deleting one window. Changing to 4' shower and layout changes to bathroom. 8" wall depression for fridge and moving linen closet. JDB Revision: Mar 6, 2013-- Rough-in bathroom in basement is now a full bathroom with shower, Storage room made to bedroom, added sink in ensuite, added a door for under stair storage. |
Application Status: | COMPLETED |
Permit Value: | $351,910.67 |
Building Area: |
309.26 M2 3,328.84 ft2 |
Issued Date: | November 20, 2012 |
File Close Date: | June 17, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
6572 GOLDEN EAGLE WAY | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
CANCELLED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2013-06-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.