BP118014 - 610 Second Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118014 - 610 Second Street | |
---|---|
Neighbourhood: | University District |
Street Address: | 610 Second Street |
Type of Application: | Single / Two Family Alteration |
File Number: | BP118014 |
Date Application Submitted: | November 02, 2012 |
Application Description: |
Secondary suite upgrade - Builder is going to uncover construction so that we can verify that a legal notice is not required. Revision December 13, 2012 Delete Tub from bathroom in 'mancave' to leave a two piece washroom. Modify wall to suit. New 4" sanitary installed for this group. Roughin for future bar sink installed....MLB |
Application Status: | COMPLETED |
Permit Value: | $42,464.44 |
Building Area: |
75.00 M2 807.29 ft2 |
Builder: | LAN-MAR CONTRACTING LTD |
Issued Date: | November 21, 2012 |
File Close Date: | July 04, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
610 SECOND STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
SCHEDULED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-07-04 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.