BP117997 - 545 Haliburton -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117997 - 545 Haliburton -- Scanned | |
---|---|
Neighbourhood: | South End |
Street Address: | 545 Haliburton -- Scanned |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP117997 |
Date Application Submitted: | October 24, 2012 |
Application Description: | Nanaimo Youth Services Association : 1st storey = 148.09 m2 , 2nd storey = 150 m2 , 3 rd storey = 124 m2 . Total area = 423 m2. Upgrade to existing rooming house. 15 sleeping rooms. Part 9 building , three storey building. Installing new sprinkler system to 13R, new fire alarm system , adding smoke detectors, new interior 45 min. FRR/FS between suites with a 45 min FRR/FS between residence suites and public corridor . 20 min suite doors and closer. New exterior exit stairway from second floor. plus new stairway to lowest level. Alternative compliance for heritage buildings applied to existing stairway to top floor, unprotected opening protection with sprinkler head adjacent to new exit stair. Interconnected floor space Repair to existing on east side of building. |
Application Status: | COMPLETED |
Permit Value: | $300,000.00 |
Building Area: |
423.00 M2 4,553.13 ft2 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | November 23, 2012 |
File Close Date: | March 28, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
545 HALIBURTON STREET | CC2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD |
PASSED
2013-03-28 |
OCCUPANCY-OLD | SCHEDULED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.