BP117980 - 2373 Rosstown Road -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117980 - 2373 Rosstown Road -- Scanned | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 2373 Rosstown Road -- Scanned |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP117980 |
Date Application Submitted: | October 17, 2012 |
Application Description: |
116 m2 Group F, Div 3 Occupancy ( Occupancy Classification report by GHL), new building (addition), to existing approximately 597.55 m2 Group A, Div 1 Occupancy , non-sprinklered building. 2 hour fire wall required. |
Application Status: | COMPLETED |
Permit Value: | $96,000.00 |
Building Area: |
116.00 M2 1,248.61 ft2 |
Issued Date: | January 15, 2013 |
File Close Date: | June 18, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
2373 ROSSTOWN ROAD | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-06-18 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.