BP117610 - 648 Terminal Avenue (650 Terminal Avenue Primary address)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117610 - 648 Terminal Avenue (650 Terminal Avenue Primary address) | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 648 Terminal Avenue (650 Terminal Avenue Primary address) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP117610 |
Date Application Submitted: | July 27, 2012 |
Application Description: |
Building D - Two Storey shell building, 2,351.8 m2 on first and 2,221.8 m2 on second floor. Total building area 4,573.6 m2. Building classification A2, D and group E. Designed to 3.2.2.23, .49 and .57, unlimitted building area, non-combustible construction 2 hour rated floor separations. Refer to BP117555 for foundation component. Alternative Solution for openings in fire separation, exit exposure and exit lobby design, Revision 2013- Apr - 04, Change to demising wall construction CRU #4 from 1 to 2 hour FRR. |
Application Status: | COMPLETED |
Permit Value: | $3,348,000.00 |
Issued Date: | February 28, 2013 |
File Close Date: | November 29, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
650 TERMINAL AVENUE | DT6 , DT6 | Property Report |
Process Steps
Task | Status |
---|---|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2013-11-29 |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.