BP117444 - 5180 Dublin way (Bldg B)- 5220 Metral (Parent)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117444 - 5180 Dublin way (Bldg B)- 5220 Metral (Parent) | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 5180 Dublin way (Bldg B)- 5220 Metral (Parent) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP117444 |
Date Application Submitted: | April 20, 2012 |
Application Description: |
FOR INSPECTIONS ONLY Building B - 5180 Dublin Way.- Foundation permit only for two Part 9 commercial buildings. Work included under this permit is the foundation, perimeter drainage and under slab plumbing pipe only. No work beyond this stage until the building permit order the remainder of the buildings is issued BP 117276. X REFERENCE BP117437, FOR THE FOUNDATION PERMIT |
Application Status: | COMPLETED |
Builder: | WESTMARK CONSTRUCTION LTD |
Issued Date: | June 04, 2012 |
File Close Date: | January 09, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
101 5180 DUBLIN WAY | CD5 | Property Report |
102 5180 DUBLIN WAY | CD5 | Property Report |
103 5180 DUBLIN WAY | CD5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-01-09 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.