BP117417 - 6195 Dennie Lane -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117417 - 6195 Dennie Lane -- Scanned | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 6195 Dennie Lane -- Scanned |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP117417 |
Date Application Submitted: | May 28, 2012 |
Application Description: |
Construction of a two storey single family dwelling, with built in double garage. Revision: Mar 26, 2013-- Changed location of retaining wall, deck beams to 3ply 2x10, remove one post to have 3 posts at rear deck and change deck joist to 2x10. Revision: Apr 2, 2013-- Changed layout of the bathroom, moved fireplace, added and deleted windows, elevation changed in garage and mechanical room (stairs and landing added), Bathroom and Laundry room swaped locations. |
Application Status: | COMPLETED |
Permit Value: | $262,997.69 |
Building Area: |
279.16 M2 3,004.85 ft2 |
Issued Date: | January 30, 2013 |
File Close Date: | July 26, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
6195 DENNIE LANE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
CANCELLED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2013-07-26 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.