BP117360 - 641 Nova Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117360 - 641 Nova Street | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 641 Nova Street |
Type of Application: | Single / Two Family Alteration |
File Number: | BP117360 |
Date Application Submitted: | May 11, 2012 |
Application Description: |
Addition of a bedroom, with ensuite bath to an existing SFD. Revision July 19, 2012...Letter to pin submitted by JEA via email. Due to Survey, building size was reduced as shown on revised plan.....MLB Revision August 30, 2012: Deleting pelete stove chimney and changing floor joists to 2x8. JB. |
Application Status: | COMPLETED |
Permit Value: | $57,153.68 |
Building Area: |
37.53 M2 403.97 ft2 |
Builder: | PITTMAN CONSTRUCTION |
Issued Date: | June 14, 2012 |
File Close Date: | July 09, 2014 |
Expiry Date: | June 14, 2014 |
Associated Properties
Address | Zone | More |
---|---|---|
641 NOVA STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-07-09 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.