BP117346 - 571 Sarum Rise Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP117346 - 571 Sarum Rise Way | |
|---|---|
| Neighbourhood: | University District | 
| Street Address: | 571 Sarum Rise Way | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP117346 | 
| Date Application Submitted: | May 09, 2012 | 
| Application Description: | 
                Construction of a two storey single family dwelling including secondary suite with slab on grade Revision....June 25, 2012...Delete center post at rear deck. Delete section of footing at stairwell.....MLB Revision August 15, 2012, Truss layout by Slegg deleted. replaced by supply form Atlas. New truss layout supplied with new doc's and truss drawings....MLB  | 
        
| Application Status: | HOLDBACK | 
| Permit Value: | $286,408.09 | 
| Building Area: | 
                        251.76 M2 2,709.92 ft2  | 
                
| Issued Date: | June 08, 2012 | 
| File Close Date: | November 16, 2012 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 571 SARUM RISE WAY | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PARTIAL | 
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            PARTIAL | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            PASSED | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible  | 
                            PASSED | 
| 
                                UNDERSLAB INSULATION
                                     Inspection required prior to placing slab concrete  | 
                            PASSED | 
| 
                                STORM CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PASSED | 
| 
                                SANITARY CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PASSED | 
| 
                                WATER CONNECTION
                                     Pipe and Connection must be visable for inspection  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping  | 
                            PASSED | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            FAILED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            PASSED | 
| 
                                OCCUPANCY-OLD
                                     Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish  | 
                            FAILED | 
| 
                                OCCUPANCY-OLD
                                     Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish  | 
                            
                                PASSED
                                     2012-11-16  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)