BP117196 - 1590 Townsite Road -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117196 - 1590 Townsite Road -- Scanned | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 1590 Townsite Road -- Scanned |
Type of Application: | Single / Two Family Alteration |
File Number: | BP117196 |
Date Application Submitted: | March 30, 2012 |
Application Description: |
To move the house to Lot A on new foundation, Re&Re all plumbing, Electrical, Drywall complete. Note: No Occupancy until driveway is paved. REVISION: Basement to be unfinished,add 4'x16' sundeck to front entry.2012-May-25.REVISION: Geotechnical Engineering added Aug-01-2012 Revision: Sept 05, 2012. No gas furnace, electric heat,moved HWT. Basement bathroom layout changed. Showing actual layout in basement. Main floor layout changed including mastersuite bathroom,addition of laundry room, one bedroom turning to a den. and 2 foot closet,no new attributes. Adding pony wall beside fridge. |
Application Status: | COMPLETED |
Permit Value: | $114,890.58 |
Building Area: |
122.63 M2 1,319.98 ft2 |
Builder: | LUKE FRAN HOLDINGS INC |
Issued Date: | May 16, 2012 |
File Close Date: | June 03, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
1590 TOWNSITE ROAD | COR1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-03-21 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.