Application Description: |
New BMW Dealership, Part 3, Building Classification, 3.2.2.62, 3.2.2.72, Group F2/E, Building Area Code 1026.61m2. Gross floor area = 1196.96 m2. Sprinkered /Fire Alarm. Accessible to 3.8. Combustible or Non Combustible construction. Two stories, Second storey, Group D with single exit = 74.95 m2 , Enclosed parts mezzanine 77 m2 = 7.5 % of the Floor area. Storage mezz = 18.4 m2, Group F3 service drive through. Group F2 showroom, parts, service area, work area , and repair shop . 2 Hour fire separation between the repair garage, work area , fluid storage area and the remainder of the building as per BCBC 3.3.5.5. 1 hr. FRR for East wall . Floor assemblies are Fire Separations with FRR of 45 min or non combustible construction. Exits = 45 min. FRR/FS. Janitor Room FS no FRR. Occupant load = 49 persons, two universal washrooms provided. X ref. Foundation Permit (BP117516) & Site works Permit (BP117052) |
Application Status: | COMPLETED |
Permit Value: | $1,760,000.00 |
Builder: | SUPERB CONSTRUCTION LTD |
Issued Date: | July 27, 2012 |
File Close Date: | September 13, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
2468 KENWORTH ROAD | I1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD |
PASSED
2013-09-13 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.