BP117024 - 5471 Hammond Bay alias 5468 Norton -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117024 - 5471 Hammond Bay alias 5468 Norton -- Scanned | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5471 Hammond Bay alias 5468 Norton -- Scanned |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP117024 |
Date Application Submitted: | March 01, 2012 |
Application Description: | Construction of a second Single Family Dwelling. Alias address of 5468 Norton. House is a walk out basement. Revision for Secondary Suite in basement and add bathroom in dwelling basement.MAY,17,2012 REVISION:New truss and engineered floor system layouts.Add stairs to exterior sundeck.Door and window changes.Review of all loads by Engineer. |
Application Status: | COMPLETED |
Permit Value: | $314,491.56 |
Building Area: |
278.52 M2 2,997.96 ft2 |
Builder: | 1041428 BC LTD |
Issued Date: | March 16, 2012 |
File Close Date: | September 28, 2012 |
Associated Properties
Address | Zone | More |
---|---|---|
5471 HAMMOND BAY ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
MONITORING FIELD REVIEW | PARTIAL |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
CANCELLED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2012-09-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.